Hi,
Currently, when using a confirm() popup box, the order of the buttons is (“Cancel”, “OK”). Is it possible to reverse the order of these buttons so that “OK” is on the left and “Cancel” is on the right?
Thanks.
Hi,
Currently, when using a confirm() popup box, the order of the buttons is (“Cancel”, “OK”). Is it possible to reverse the order of these buttons so that “OK” is on the left and “Cancel” is on the right?
Thanks.
Thanks Nastja,
No way to do it on a confirm (without switching to a modal)?
Thanks.